top of page

EXTENSION BUILDER NIDDRIE

Custom Homes, Townhouses & Extensions in Niddrie

Niddrie is a suburb of post-war brick and weatherboard homes on good-sized blocks, close to Keilor Road and Essendon Fields. Many of those homes are now due for a rebuild, a second storey or a subdivision into townhouses. We built two townhouses on Shaw Street in 2011, and we've built across the neighbouring suburbs of Strathmore, Aberfeldie, Keilor and East Keilor.


Building in Niddrie


Niddrie is in the City of Moonee Valley, and the Moonee Valley Planning Scheme applies.

  • Neighbourhood character. Moonee Valley's Neighbourhood Character Study guides new homes and extensions in the General Residential Zone, including front setbacks, roof forms, garden space and how a new home sits beside its neighbours.

  • Townhouses and subdivision. Two or more dwellings on a lot need a planning permit and must meet ResCode standards for overlooking, overshadowing, private open space and car parking. We work with your designer and planner from the start so the design is buildable and on budget.

  • Knockdown rebuilds. Demolition needs consent from the building surveyor, and any Heritage Overlay must be checked first. We plan demolition, asbestos removal and service disconnections into the schedule.

  • Essendon Fields. Properties near the airport may have height or noise-related controls. We check your property's overlays before design.

  • Energy rules. New homes and townhouses must achieve 7-star NatHERS and a whole-of-home rating of at least 60.

Casey manages permits and approvals, working with a building surveyor we've partnered with for more than 15 years.


Our work in and around Niddrie


  • Shaw Street, Niddrie: two townhouses (2011)

  • Westgateway, East Keilor: three townhouses (2012)

  • Hill Court, Keilor: full renovation (2020)

  • Strathmore: new custom homes on Mascoma Street (2024) and Elysee Court, Strathmore Heights (2025), and a full internal renovation on Glenscott Crescent (2023)

  • Combermere Street, Aberfeldie: the Iscaro Residence (2024)

What we build in Niddrie


  • Custom homes and knockdown rebuilds

  • Townhouses and dual occupancies

  • Second storeys and rear extensions

  • Full renovations of post-war homes

  • Outdoor living

How we build


Every M.M job is fully scheduled before construction starts, and the office tracks every build against it daily. Extensions and renovations typically take 6–11 months, new custom homes 10–12 months, and knockdown rebuilds 11–13 months. You'll meet Mick on site every three weeks and get a written progress update every fortnight. Pricing is fully inclusive, with allowances only for cabinetry, benchtops and tiles.


Common questions


Can I build two townhouses on my Niddrie block? Often, yes, with a planning permit. Block width, ResCode and neighbourhood character guidelines decide what fits.

Should I knock down or extend? It depends on the condition of the house and what you need. We price both options during The First Call and briefing.

How long does a knockdown rebuild take? Typically 11–13 months from demolition to handover.


Start with The First Call


The First Call is a free initial consultation with a builder: a phone call with Mick about your property, plans, budget and timing.

Planned from day one. Built on time.

bottom of page