CUSTOM HOME BUILDER ABERFELDIE
Renovations, Second Storeys & Custom Homes in Aberfeldie

Aberfeldie sits on the Maribyrnong River, with Federation, interwar and post-war homes on generous, often sloping blocks. It's a suburb where families renovate and extend rather than move. Our most recent Aberfeldie project, the Iscaro Residence on Combermere Street, took an older home back to its frame and added a rear extension, a second storey and a detached double-storey studio.
Building in Aberfeldie
Aberfeldie is in the City of Moonee Valley, and the Moonee Valley Planning Scheme applies.
Heritage. Some Aberfeldie streets and homes are under a Heritage Overlay. If yours is, demolition, extensions, external alterations and sometimes fences and paint colours need a planning permit. Council recommends a pre-application meeting, and its heritage advisory service is free.
Neighbourhood character. Even without heritage controls, Moonee Valley's Neighbourhood Character Study guides setbacks, roof forms and garden space in the General Residential Zone.
The river and the slope. Blocks near the Maribyrnong can be steep and some low-lying land is subject to flooding controls. Those applications may be referred to Melbourne Water, with floor levels set above the flood level. We check before design.
Second storeys on older homes. Adding a storey to a Federation or interwar home means checking footings, restumping or underpinning where needed, and designing the addition so it sits well behind the original.
Energy rules. New homes must achieve 7-star NatHERS and a whole-of-home rating of at least 60. Larger renovations may need to comply too.
Casey manages permits and approvals, working with a building surveyor we've partnered with for more than 15 years.
Our work in Aberfeldie
Combermere Street, the Iscaro Residence: full gut renovation, rear extension, new second storey and a detached double-storey garage and studio (2024)
Nearby, we've built new homes on Mascoma Street and Elysee Court in Strathmore, an outdoor renovation on Roberts Street in Essendon, and double-storey extensions across Moonee Ponds.
What we build in Aberfeldie
Full renovations of Federation, interwar and post-war homes
Second storeys and rear extensions
Custom homes and knockdown rebuilds
Detached studios, garages and home offices
Outdoor living, decks and pools
How we build
Every M.M job is fully scheduled before construction starts, and the office tracks every build against it daily. Extensions and renovations typically take 6–11 months, new custom homes 10–12 months, and knockdown rebuilds 11–13 months. You'll meet Mick on site every three weeks and get a written progress update every fortnight. Pricing is fully inclusive, with allowances only for cabinetry, benchtops and tiles.
Common questions
Can I add a second storey to my Aberfeldie home? Often, yes. We did it on Combermere Street. It depends on the structure, overlays and neighbours, which we check first.
Is my Aberfeldie home in a Heritage Overlay? Some are. We check the planning scheme maps for your address before design starts.
Can you build a studio or garage at the back? Yes. The Iscaro Residence included a detached double-storey garage and studio.
Start with The First Call
The First Call is a free initial consultation with a builder: a phone call with Mick about your property, plans, budget and timing.
Planned from day one. Built on time.
